Model NO.: CS-A
Barbed Distance: 4"
Barb Length: 10mm
Coil Outside Diameter: 960mm
Color: Blue
Name: CS-a Barbed Wire Machine
Raw Material: PVC Coated Wire, Galvanized Wire
Main Drive Speed: 402r/Min
Wire Diameter: 2.2mm-3.0mm
Barbed Wire Diameter: 1.8mm-2.2mm
Barbed Space: 76mm(3′)/102mm(4′)/127mmm(5′)
Twisted Number: 245m/Min
Main Part Size: 1950*950*1300mm
Take-Twisting Part Size: 1760*550*760mm
Unit Weight: 1050kg
Trademark: JIAKE
Transport Package: Plastic Films/Woden Box
Specification: CE
Origin: Hebei, China
HS Code: 8463300000
I. DescriptionIllustration of working principle:
This machine can produce barbed wire, the materials of barbed wire usually hot dipped galvanized wire, electric galvanized wire and PVC coated wire etc.Â
Application: This machine can produce barbed wire which is widely used in national defense, railway, highway, agriculture, animal husbandry and other industries.
Advantages: Saving materials and high capacity.
II.Theoretical parameter
Model | CS-A Type |
Motor power | 3kw |
Main drive shaft speed | 402r/min |
Wire diameter | 2.2mm-3.0mm |
Barbed wire diameter | 1.8mm-2.2mm |
Barbed space | 76mm(3')/102mm(4')/127mmm(5') |
Twisted number | 3-5 |
Theoretical production | 70kg/h |
Total weight | 1050kg |
Main part size | 1950mm*950mm*1300mm |
Take-twisting part size | 1760mm*550mm*760mm |
IV.Finished Products
V.Commercial terms
1. FOB CIF CFR are all available
2. Payment: 30% T/T in advance, the balance 70% by T/T after check the machine at seller's factory.
3. Minimum order quantity: 1 set
4. Certification: ISO 9001 Certificate
5. Delivery time: 30 days from received your payment in advance.
6. Country of origin: China
7. Our guarantee time: 12 months after the equipment is accepted by the buyer, however, the guarantee period is no longer than 18 months after equipment's departure from Xingang port, China.
8. Installation: we could arrange our engineer install the machine in your factory.
7. Our guarantee time: 12 months after the equipment is accepted by the buyer, however, the guarantee period is no longer than 18 months after equipment's departure from Xingang port, China.
8. Installation: we could arrange our engineer install the machine in our factory.
VI. Contact Information
Â
Chengsheng Steel Pipe Co., Ltd , http://www.sdsteelpipes.com